{"id":2496,"date":"2025-08-06T22:23:00","date_gmt":"2025-08-07T02:23:00","guid":{"rendered":"https:\/\/hoanthienstone.vn\/en\/?p=2496"},"modified":"2026-02-01T23:04:09","modified_gmt":"2026-02-02T04:04:09","slug":"grand-mercure-hotel-project","status":"publish","type":"post","link":"https:\/\/hoanthienstone.vn\/en\/grand-mercure-hotel-project\/","title":{"rendered":"Grand Mercure Hotel Project"},"content":{"rendered":"<p>Project name: Grand Mercure Hotel<\/p>\n<p>Location: No. 9, Cat Linh, Dong Da, Ha Noi<\/p>\n<p>Investor:Thanh Hoa Construction Corporation<br data-start=\"251\" data-end=\"254\" \/>Scope of Work: Complete finishing of floors and counters on levels 1 and 2<br data-start=\"332\" data-end=\"335\" \/>Volume: 450 m\u00b2 of decorative stone and 1,056 m\u00b2 of flooring stone<br data-start=\"404\" data-end=\"407\" \/>Construction Duration: 90 days<br data-start=\"441\" data-end=\"444\" \/>Stone Codes Used: HT-M002 (Cream Marfil), HT-M006 (Volakas), HT-M005 (Dark Emperador)<\/p>\n<p data-start=\"535\" data-end=\"555\">Project Overview<\/p>\n<p data-start=\"557\" data-end=\"944\">Grand Mercure is a premium international hotel brand, renowned for its luxurious and refined design standards. To match its prestige and distinct architectural identity, the entire interior space of levels 1 and 2 at the Cat Linh location was completed using high-end natural stones \u2014 custom-processed and installed by <strong>HOANTHIENSTONE<\/strong> to meet the investor\u2019s strict technical requirements.<\/p>\n<p data-start=\"951\" data-end=\"1005\"><strong data-start=\"951\" data-end=\"1005\">1. MATERIAL SELECTION \u2013 THE FOUNDATION OF ELEGANCE<\/strong><\/p>\n<p data-start=\"1007\" data-end=\"1051\">The project utilized three main stone types:<\/p>\n<ul data-start=\"1053\" data-end=\"1516\">\n<li data-start=\"1053\" data-end=\"1197\">\n<p data-start=\"1055\" data-end=\"1197\">HT-M002 \u2013 Cream Marfil: Soft beige tone with a polished surface, ideal for lobbies and corridors, creating an open, light-filled ambiance.<\/p>\n<\/li>\n<li data-start=\"1198\" data-end=\"1342\">\n<p data-start=\"1200\" data-end=\"1342\">HT-M005 \u2013 Dark Emperador: Spanish brown marble with unique cloudy veins, used for trim lines and border inlays, adding depth and richness.<\/p>\n<\/li>\n<li data-start=\"1343\" data-end=\"1516\">\n<p data-start=\"1345\" data-end=\"1516\">HT-M006 \u2013 Volakas: Pure white background with gentle grey veining, used for subtle yet sophisticated decorative panels that complement Grand Mercure\u2019s signature style.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1523\" data-end=\"1570\"><strong data-start=\"1523\" data-end=\"1570\">2. REALIZED DESIGN \u2013 LUXURY IN EVERY DETAIL<\/strong><\/p>\n<p data-start=\"1572\" data-end=\"1643\">From the moment guests step inside, the hotel\u2019s distinction is evident:<\/p>\n<ul data-start=\"1645\" data-end=\"2171\">\n<li data-start=\"1645\" data-end=\"1774\">\n<p data-start=\"1647\" data-end=\"1774\">The main lobby is paved entirely with Cream Marfil, accented by Dark Emperador borders that smartly define different zones.<\/p>\n<\/li>\n<li data-start=\"1775\" data-end=\"1916\">\n<p data-start=\"1777\" data-end=\"1916\">The staircase to level 2 is elegantly curved, with seamless marble slabs covering both risers and treads for a refined, durable finish.<\/p>\n<\/li>\n<li data-start=\"1917\" data-end=\"2171\">\n<p data-start=\"1919\" data-end=\"2171\">Reception, buffet, and lounge areas feature large stone countertops crafted at <strong>HOANTHIENSTONE<\/strong>\u00a0factory, ensuring perfect polish, precision edge finishing, and excellent moisture resistance \u2014 ideal for high-humidity environments like open kitchens.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2178\" data-end=\"2225\"><strong data-start=\"2178\" data-end=\"2225\">3. TIMELY EXECUTION \u2013 QUALITY YOU CAN TRUST<\/strong><\/p>\n<p data-start=\"2227\" data-end=\"2389\">With a total installation volume of over 1,500 m\u00b2 of natural stone, <strong>HOANTHIENSTONE<\/strong> completed the project in just 90 days \u2014 meeting the investor\u2019s urgent schedule.<\/p>\n<p data-start=\"2391\" data-end=\"2562\">All stone pieces were processed in-house using CNC cutting systems, carefully polished and sealed, then transported and installed by a seasoned technical team. The result:<\/p>\n<ul data-start=\"2564\" data-end=\"2765\">\n<li data-start=\"2564\" data-end=\"2617\">\n<p data-start=\"2566\" data-end=\"2617\">Flawless level flooring with no surface unevenness.<\/p>\n<\/li>\n<li data-start=\"2618\" data-end=\"2660\">\n<p data-start=\"2620\" data-end=\"2660\">Clean, precise grout lines with no gaps.<\/p>\n<\/li>\n<li data-start=\"2661\" data-end=\"2714\">\n<p data-start=\"2663\" data-end=\"2714\">Seamless transitions at edges, columns, and joints.<\/p>\n<\/li>\n<li data-start=\"2715\" data-end=\"2765\">\n<p data-start=\"2717\" data-end=\"2765\">Symmetrical CNC patterns with perfect alignment.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2772\" data-end=\"2817\"><strong data-start=\"2772\" data-end=\"2817\">4. WHY GRAND MERCURE CHOSE HOANTHIENSTONE<\/strong><\/p>\n<ul data-start=\"2819\" data-end=\"3021\">\n<li data-start=\"2819\" data-end=\"2869\">\n<p data-start=\"2821\" data-end=\"2869\">Proven experience with 4\u20135 star hotel projects.<\/p>\n<\/li>\n<li data-start=\"2870\" data-end=\"2913\">\n<p data-start=\"2872\" data-end=\"2913\">In-house stone sourcing and fabrication.<\/p>\n<\/li>\n<li data-start=\"2914\" data-end=\"2958\">\n<p data-start=\"2916\" data-end=\"2958\">Expertise in complex CNC pattern cutting.<\/p>\n<\/li>\n<li data-start=\"2959\" data-end=\"3021\">\n<p data-start=\"2961\" data-end=\"3021\">On-time delivery with post-installation technical warranty.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3023\" data-end=\"3344\">Grand Mercure Cat Linh is more than just a premium urban hotel in Hanoi \u2014 it\u2019s a showcase of how modern architecture and traditional natural materials can harmonize. This project exemplifies technical precision and artistic spirit in every slab of stone, and <strong>HOANTHIENSTONE<\/strong> is proud to be the execution partner behind it.<\/p>\n<p data-start=\"3346\" data-end=\"3495\">Real images from the <strong>Cat Linh<\/strong> site highlight the careful investment in both materials and craftsmanship, worthy of a true 5-star international hotel.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/hoanthienstone.vn\/wp-content\/uploads\/2025\/07\/cong_trinh_khach_san_grand_mercure4-600x400.jpg\" \/><\/p>\n<p style=\"text-align: center;\">Level 2 Countertops<\/p>\n<p style=\"text-align: center;\"><img decoding=\"async\" src=\"https:\/\/hoanthienstone.vn\/wp-content\/uploads\/2025\/07\/cong_trinh_khach_san_grand_mercure5-600x400.jpg\" \/><\/p>\n<p style=\"text-align: center;\">Level 1 Countertops<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-2456\" src=\"https:\/\/hoanthienstone.vn\/wp-content\/uploads\/2025\/07\/cong_trinh_khach_san_grand_mercure2-600x400.jpg\" alt=\"\" width=\"600\" height=\"400\" \/><\/p>\n<p style=\"text-align: center;\">Flooring and Column Cladding<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-2455\" src=\"https:\/\/hoanthienstone.vn\/wp-content\/uploads\/2025\/07\/cong_trinh_khach_san_grand_mercure1-600x400.jpg\" alt=\"\" width=\"600\" height=\"400\" \/><\/p>\n<p style=\"text-align: center;\">Three-step staircase<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-2454\" src=\"https:\/\/hoanthienstone.vn\/wp-content\/uploads\/2025\/07\/cong_trinh_khach_san_grand_mercure-600x400.jpg\" alt=\"\" width=\"600\" height=\"400\" \/><\/p>\n<p style=\"text-align: center;\">Staircase<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project name: Grand Mercure Hotel Location: No. 9, Cat Linh, Dong Da, Ha Noi Investor:Thanh Hoa Construction CorporationScope of Work: Complete finishing of floors and counters on levels 1 and 2Volume: 450 m\u00b2 of decorative stone and 1,056 m\u00b2 of flooring stoneConstruction Duration: 90 daysStone Codes Used: HT-M002 (Cream Marfil), HT-M006 (Volakas), HT-M005 (Dark Emperador) [&#8230;]\n","protected":false},"author":4,"featured_media":2497,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[120,253],"tags":[],"class_list":["post-2496","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-project"],"_links":{"self":[{"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/posts\/2496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/comments?post=2496"}],"version-history":[{"count":3,"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/posts\/2496\/revisions"}],"predecessor-version":[{"id":2501,"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/posts\/2496\/revisions\/2501"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/media\/2497"}],"wp:attachment":[{"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/media?parent=2496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/categories?post=2496"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hoanthienstone.vn\/en\/wp-json\/wp\/v2\/tags?post=2496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}